|
|
|
|
|
|
|
|
- (1)
- (14)
- (8)
- (6)
- (14)
- (1)
- (10)
- (15)
- (30)
|
|
|
|
|
Build Your Online Product Catalogs?
Product Name: |
cummins ve pump delivery valves 131110-6820 A49 Bo
|
Supply Ability: |
50000 |
Related proudcts |
|
Specifications |
ISO9001:2015 |
Price Term: |
FOB |
Port of loading: |
XIAMEN |
Minimum Order |
6 |
Unit Price: |
11 |
|
cummins ve pump delivery valves 131110-6820 A49 Bosch Pump Delivery Valves
where to buy cummins ve pump delivery valves 131110-6820 A49 Bosch Pump Delivery Valves where to buy cummins ve pump delivery valves ,china lutong is the best choice. where to buy Bosch Pump Delivery Valves ,china lutong is the best choice. #cummins ve pump delivery valves# #Bosch Pump Delivery Valves# ## JUL GAO
Product Description: Pencil nozzle: Pencil Nozzle is one of the main components of fuel injection systems. It regulates the flow of fuel to the ultimate ignition Co***rtment.
The main function of Pencil nozzle is to convert the diesel into the diesel vapours and spray it on the piston.
China Lutong Parts Plant is a manufacturer specialist in diesel engine parts. Our majored products is Ve Pump, diesel injection parts, diesel nozzle, diesel injection parts, diesel engine parts, diesel fuel injection system, and the interrelated products (such as Head Rotor, Feed Pump, Cam Plate, Drive Shaft, Manget Valve, etc. ), Plunger(A, AS, P, PS7100, P8500, MW type, etc. ), Nozzle (Dn, DNOPDN, S, SN, PN and so on. ), Delivery Valve, Pencil Nozzles and so on.
LUCAS Head Rotor Ve pump part 7123/340E LUCAS Head Rotor Ve pump part 7123/345U LUCAS Head Rotor Ve pump part 7139/130T Head Rotor Ve pump part 2 468 336 013 B336 013 VMW/OPEL/VMW-X Head Rotor Ve pump part 1 468 333 320 A333 320 BENFRA/Iveco Nozzle S 0 433 271 045 DLLA150S186 BENC Nozzle S 0 433 271 221 DLLA144S485 BENC Nozzle S 0 433 271 471 DLLA134S999 BENC Nozzle S 0 433 271 477 DLLA134S999 BENC
Q: Could you accept sample order? A: yes, we could accept sample order, we have confidence on our products quality Q. Could you accept customization? A: accept OEM and ODM. We offer power solution with engine assy for many construction machinery factories, genset factories, ship factories and other co***nies. Q: How about the preparation time? A: Within 2 business days for items in stock; 10-30 days for items out of stock Q: What packing ca |
Company: |
China-lutong Machinery Co., Ltd.
|
Contact: |
Ms. dieselnozzles GAO |
Address: |
Dubin Industrial District, Hanjiang |
Postcode: |
311100 |
Tel: |
86 594 3605653 |
Fax: |
|
E-mail: |
|
|
|